Work description
The LNG export facility consists of a 2.4 km long access trestle supported on steel piles, a marine terminal building and platform from which the loading operations are monitored, a loading platform with loading arms, breasting and mooring dolphins and a berth for the tugs.
Tecon services
Feed advanced design of the Marine Terminal structures and marine equipment including:
- Design of the Approach and Jetty Trestle (40m typical spans mixed construction on raked piles)
- Geotechnical and Structural Design of Piles
- Design of the Loop platforms
- Design of the Mooring and Breasting Dolphins
- Design of the catwalks
- Design of the Berth Platform (concrete structure on steel piles)
- Design of the auxiliary moorings
- Design of the Service Platform
- Marine equipment selection
- Ship Mooring Analyses
- Tender Specifications
- Cost Estimate