SAKHALIN II Phase 2

Owner: Sakhalin Energy Investment Company Ltd
Client: SAMSUNG SAIPEM
Country: RUSSIA
Period: 2004- 2005
TECON SOW: Transportation and Installation of LUN-A & PA-B topsides by the Float-over Mating system
Work description

Transportation and Installation of LUNSKOYE (LUN-A) & PILTUN-ASTOKHSKOYE (PA-B) topsides using purpose built T-shaped cargo barges having a maximum displacement over 50.000,00 t.

Tecon services
  • Transportation Analyses
  • Sea-fastening Detailed Design
  • Float-over Mating Analyses
  • Float-over Mating System Detailed Design