Dunkerque LNG Terminal (in construction)

Owner: EDF FRANCE
Client: ARTELIA/SOGREAH
Country: France
Period: 2009- 2013
TECON SOW: Feed design of the LNG Marine Terminal
Work description
  • LNG import terminal with capacity of 10 Mm3 /year.
  • Marine terminal with a berthing front length of 450 m for vessels range of 65.000 to 267.000 cubic meters.
  • Platform and dolphins in welded steel structure.
Tecon services
  • Feed structural and geotechnical design of the Platform and dolphins and specifications for construction bid.
  • Assistance to the Owner during the work execution phases.