Milan Line 4 - Building response to Tunnelling

Owner: Metropolitana Milanese
Client: ASTALDI
Country: Italy
Period: 2011- 2012
TECON SOW: Service soil structure interaction analyses of sensible buildings response to mechanized tunneling
Work description
  • Before executing the mechanized tunnelling of the Underground Line 4 several critical buildings on the line route have been subject to a control of the settlement induced by the excavation and a damage classification assessment.
Tecon services
  • Soil-Structure Interaction Analyses of Sensible Building Response To Mechanized Tunnelling
  • 3D Soil-Structural analyses by means of FEM program