PG-1 PLATFORM REPAIRS

  • Owner: LOTOS Petrobaltic
  • Client: LOTOS Petrobaltic
  • Country: POLAND
  • Period: 2011- 2012
  • TECON SOW: Detailed Design of Platform Repairs System

Work description

The PG-1 well head platform was installed about 40 nautical miles away from shore in the Baltic Sea, Polish sector in a water depth of 80.0 m. The repairs system design by TECON  consist in three sets of four welded tubular frames each, each set is then to be connected to the existing  tower legs by bolted clamps.

In addition a Tubular struts (900 mm OD) with welded 940 mm OD pile sleeve and mud mat. At the top of each Tubular strut is welded a transverse 24” pipes lying on one horizontal line connected with the lower repair frame. A 30” OD piles will be drill installed and grouted to the soil and to the sleeve.

Tecon services

Project Categories

TECON srl
Strada 1 Palazzo WTC
20090 - Milanofiori - Assago (MI), Italy
Tel: 02 92882150

P.IVA / Cod.Fisc.: 06503230150
TECON srl non è a socio unico e non è in stato di liquidazione.

Certification
Tecon QMS is certified ISO 9001-2015 by Lloyd’s LRQA