Work description
Pier 1 Dolphin revamping includes the following:
- N° 2 new MD’s with 240 tons allowable capacity made up by N° 4 raked piles
- N° 4 new BD’s monopiles 1800 mm diameter for both energy and breast forces
- Revamping of N° 4 existing external BD’s (four piles) with new fendering system
- Revamping of N° 4 existing internal BD’s (four piles) with new fendering system and addition of N° 4 piles 1800 mm diameter for both fendering and spring retention
- N° 1 new MD monopile 1800 mm diameter shore side of the berth 1 for small and Handymax vessels
Pier 2 Dolphin revamping includes the following:
- N° 1 new MD with 240 tons allowable capacity made up by N° 4 raked piles
- Revamping of N° 4 existing external BD’s (six piles) with new fendering system
- Revamping of N° 4 existing internal BD’s (four piles) with new fendering system and addition of N° 4 piles 1800 mm diameter for both fendering and spring retention
- N° 1 new MD monopile 1800 mm diameter shore side of the berth 3 for small and Handymax vessels