Work description
- Before executing the mechanized tunnelling of the Underground Line 4 several critical buildings on the line route have been subject to a control of the settlement induced by the excavation and a damage classification assessment.
Tecon services
- Soil-Structure Interaction Analyses of Sensible Building Response To Mechanized Tunnelling
- 3D Soil-Structural analyses by means of FEM program