TOLMOUNT Platform

  • Owner: Premier Oil
  • Client: Rosetti Marino
  • Country: North Sea – British Sector
  • Period: 2018 - 2020
  • TECON SOW: Detail design of the Platform

Work description

Minimum Facilities Platform (MFP) with 6 well slots, as well as acting ad a central gathering facility (CGF) for a number of future subsea production wells tied-back to the platform.

·4-legged Jacket with two 96” piles per leg·6 No. 30” conductors·1 No. 22” export gas riser +  1 No. 3” methanol import riser·2 No. 12” future import risers +  2 No. 8” future import risers·1 No. J-tube caisson containing 4 No. 12” J-tubes and 1 No. 8” J-tube·1 No. Produced water caisson·Water depth 51.5m LAT·Topside / Jacket weights  2600t / 2400t

The Topsides contains and emergency overnight accommodation (EOA) for 12 people, a helideck for Augusta AW-139 helicopter, a platform crane, a lifeboat and two landing areas for walk-to-work access.

Tecon services

Project Categories

Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.