Tolmount Platform

  • Owner: Premier Oil
  • Client: ROSETTI MARINO
  • Country: North Sea – British Sector
  • Period: 2018 - 2020
  • TECON SOW: Detail design of the Platform

Work description

Minimum Facilities Platform (MFP) with 6 well slots, as well as acting ad a central gathering
facility (CGF) for a number of future subsea production wells tied-back to the platform.

• 4-legged Jacket with two 96” piles per leg
• 6 No. 30” conductors
• 1 No. 22” export gas riser + 1 No. 3” methanol import riser
• 2 No. 12” future import risers + 2 No. 8” future import risers
• 1 No. J-tube caisson containing 4 No. 12” J-tubes and 1 No. 8” J-tube
• 1 No. Produced water caisson
• Water depth 51.5m LAT
• Topside / Jacket weights 2600t / 2400t

The Topsides contains and emergency overnight accommodation (EOA) for 12 people, a
helideck for Augusta AW-139 helicopter, a platform crane, a lifeboat and two landing areas
for walk-to-work access.

Tecon services

Detail design of the Tolmount platform Topside and Jacket structures for the in-place and temporary phases

Project Categories

Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.