PIER 1&2 REVAMPING OF DOLPHINS

  • Owner:
  • Client: SIOT TRIESTE
  • Country:
  • Period: 2021- 2022
  • TECON SOW: DETAILED DESIGN OF NEW MOORING DOLPHINS AND BREASTING DOLPHIN REVAMPING

Work description

Pier 1 Dolphin revamping includes the following:

Pier 2 Dolphin revamping includes the following:

Tecon services

Project Categories

Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.