Unmanned Wellhead Platform | Republic of Congo
The Libondo Platform (LB1) represents a significant offshore engineering achievement designed for TOTAL and constructed by ROSETTI MARINO. TECON provided comprehensive detailed design services for this critical oil and gas infrastructure project, encompassing the platform jacket, deck structures, and foundation piles. The project demonstrates advanced engineering capabilities in deep water offshore installations and integrated topside design.
Located in the challenging offshore environment of the Republic of Congo, the platform operates in 113.6 meters of water depth. The project required extensive analysis across multiple operational scenarios including in-service conditions, fatigue assessment, load-out procedures, lifting operations, transportation, and installation. TECON’s engineering team delivered complete structural solutions that met stringent safety and performance requirements for this unmanned production facility.
The Libondo Platform is an unmanned wellhead facility designed for maximum oil production capacity of 1,800 cubic meters per day and water injection capacity of 1,600 cubic meters per day. The facility features 10 wellhead slots to support comprehensive field development operations. The integrated design approach allowed for complete equipment installation onshore, optimizing construction efficiency and offshore installation procedures.
TECON’s engineering methodology incorporated advanced finite element analysis techniques and compliance with international offshore standards. The design process integrated multiple load cases and environmental conditions specific to the West African offshore environment, including wave loading, current forces, wind effects, and seismic considerations. Close collaboration with the construction yard throughout the project ensured practical constructability while maintaining structural performance requirements.
The comprehensive scope included support for fabrication activities, quality control procedures, and ballasting operations during load-out. TECON’s engineering team provided ongoing technical support to resolve construction challenges and optimize installation procedures. This integrated approach resulted in successful platform delivery and installation within the challenging project timeline of 2008-2009.