Preparation of basis of design
Feasibility analysis of laying
Selection of laying method
Definition of shore approach method
Preparation of technical specifications
Sealine strength checks for all laying phases
Sealine stability checks during laying and in operation
Definition of onshore assembly yard area and profile
Design of fixed and adjustable rollers for onshore line assembly
Design of floaters and relevant attachments to the sealine
Design of pulling head and pulling line fittings
Mooring system design and assessment
Definition of stinger dimensions and handling system
Structural design of stinger and connections to laying vessel
Dynamic analysis of vessel motions with mooring/DP systems
Study of stinger installation/removal and handling aids design
Structural design of J-lay tower and connections to laying vessel
Study of J-lay tower installation/removal and handling aids