Tecon srl-Additional Living Quarter - North Field Bravo
2017 - In-progress

Detailed Design of the Additional Living Quarter Platform

Owner: QATARGAS
Client: Rosetti Marino
Tecon srl-Gioia Tauro LNG Terminal
2008 - 2014

Tirreno Sea Feed Design of a LNG Marine Terminal for 70.000 to 250.000 Gas Carriers in water depth up to 70 m

Owner: LNG MED GAS
Client: LNG MED GAS
Tecon srl-Gioia Tauro LNG Terminal
2008 - 2014

Tirreno Sea Feed Design of a LNG Marine Terminal for 70.000 to 250.000 Gas Carriers in water depth up to 70 m

Owner: LNG MED GAS
Client: LNG MED GAS
Tecon srl-MARLIN Platform
2013 - 2014

Marlin Drilling and Production Platform in 110 m water depth. Four leg Jacket, Deck and Living Quarter. Platform total weight 8.500 tons

Owner: FOXTROT INTERNATIONAL
Client: ROSETTI MARINO
Tecon srl-MARLIN Platform
2013 - 2014

Marlin Drilling and Production Platform in 110 m water depth. Four leg Jacket, Deck and Living Quarter. Platform total weight 8.500 tons

Owner: FOXTROT INTERNATIONAL
Client: ROSETTI MARINO
Tecon srl-CLIPPER Platform
2013 - 2014

PH accommodation Platform four legs, 22 m water depth, UK North Sea. Total weight 5000 tons. Detail Design of Jacket, Deck, Helideck and Bridge

Owner: Shell UK Ltd
Client: ROSETTI MARINO
Tecon srl-CLIPPER Platform
2013 - 2014

PH accommodation Platform four legs, 22 m water depth, UK North Sea. Total weight 5000 tons. Detail Design of Jacket, Deck, Helideck and Bridge

Owner: Shell UK Ltd
Client: ROSETTI MARINO
Tecon srl-FILANOVSKY Topsides
2013 - 2014

N° 3 Topsides to be installed by Float-over Mating System - Weights ranging of 2.000 5.000 and 10.000 tons Analysis and Design of the Mating system

Owner: LUKOIL
Client: SAIPEM
Tecon srl-FILANOVSKY Topsides
2013 - 2014

N° 3 Topsides to be installed by Float-over Mating System - Weights ranging of 2.000 5.000 and 10.000 tons Analysis and Design of the Mating system

Owner: LUKOIL
Client: SAIPEM
Tecon srl-CONCORDIA Wreck Removal Project
2012 - 2014

CONCORDIA Ship Accident Conception of the Wreck Removal Structural and Geotechnical Detailed Design and Assistance on Site to Salvage Contractors

Owner: CARNIVAL
Client: TITAN/MICOPERI JV
Tecon srl-CONCORDIA Wreck Removal Project
2012 - 2014

CONCORDIA Ship Accident Conception of the Wreck Removal Structural and Geotechnical Detailed Design and Assistance on Site to Salvage Contractors

Owner: CARNIVAL
Client: TITAN/MICOPERI JV
Tecon srl-Nigeria - Saipem Service Quay
2013 - 2014

Sheet Pile Anchored Quay long 130 m - Basic Design for two alternative solutions

Owner: SAIPEM SCNL
Client: SAIPEM MILAN
Tecon srl-Venice Mose Barries
2004 - 2013

Detailed Design of Steel Flap Gates for the protection of Venice and its lagoon from high waters.

Owner: MAGISTRATO alle ACQUE di VENEZIA
Client: TECHNITAL
Tecon srl-Venice Mose Barries
2004 - 2013

Detailed Design of Steel Flap Gates for the protection of Venice and its lagoon from high waters.

Owner: MAGISTRATO alle ACQUE di VENEZIA
Client: TECHNITAL
Tecon srl-Dunkerque LNG Terminal
2009 - 2013

North Sea France LNG Import Terminal with capacity of 10 Mm3 /year for vessels range of 65.000 to 267.000 m3 capacity

Owner: EDF FRANCE
Client: ARTELIA/SOGREAH
Tecon srl-WEST FRANKLIN AND ELGIN B PLATFORMS
2011 - 2013

North Sea West Franklin and Elgin B Platforms in water depth of 90.0 m. Design of topsides and 96 m long steel bridge

Owner: TOTAL
Client: ROSETTI MARINO
Tecon srl-WEST FRANKLIN AND ELGIN B PLATFORMS
2011 - 2013

North Sea West Franklin and Elgin B Platforms in water depth of 90.0 m. Design of topsides and 96 m long steel bridge

Owner: TOTAL
Client: ROSETTI MARINO
Tecon srl-Wasit Platforms
2011 - 2013

Hasbah and Arabiyah Offshore Fields N° 2 Platforms 8 legs in 45.3m and 51.4m water depth. Weight of each platform 8.000 tons

Owner: SAUDI ARABIA ARAMCO
Client: SAIPEM
Tecon srl-Wasit Platforms
2011 - 2013

Hasbah and Arabiyah Offshore Fields N° 2 Platforms 8 legs in 45.3m and 51.4m water depth. Weight of each platform 8.000 tons

Owner: SAUDI ARABIA ARAMCO
Client: SAIPEM
Tecon srl-Castorone J-Lay Tower
2012 - 2013

Design of the complete pipe J-laying system to be installed on the mono-hull Pipe Laying Vessel Castorone

Owner: SAIPEM SPA
Client: SAIPEM SPA
Tecon srl-Shell Prelude GFLNG FPSO
2012 - 2013

Structural design of two helidecks with parking area for Sikorsky S92 helicopter installed on Shell Prelude GFLNG FPSO.

Owner: SHELL
Client: BAYARDS
Tecon srl-Central Metering & Manifold Platform
2011 - 2012

Iraq Crude Oil Export Expansion Project (ICOOEP) CMMP Platform 8 leg in Persian Gulf water depth of 27.5 m Topside installed by Float-over Mating system

Owner: SOUTH OIL COMPANY
Client: SAIPEM
Tecon srl-East Anglia One - Wind Farm
- 2012

AC/DC Converter Platform of the Wind Farm Field in 40 m water depth weighting 12.000 tons - Basic Design of Topside and Jacket

Owner: EAST ANGLIA ONE
Client: TECHNIP ROME/ALSTOM
Tecon srl-Congo Quay Project
2011 - 2012

Reconstruction of existing Quays G1 and G2-G3 (development of 243 and 290 m) and extension of new quay G4 with front of 275m.

Owner: SAIPEM CONGO
Client: SAIPEM ROME
Tecon srl-PG-1 PLATFORM REPAIRS
2011 - 2012

BALTIC SEA Detailed Design of Platform Repairs by tubular stayed system anchored by drilled piles on sea bottom

Owner: LOTOS Petrobaltic
Client: LOTOS Petrobaltic
Tecon srl-Jasmine Jacket Construction Services
2010 - 2011

Construction engineering and Load-out services for a 4-legs Jacket structure to be installed in 81.7 m water depth.

Owner: CONOCO PHILIPS
Client: ROSETTI MARINO
Tecon srl-High Speed Railway Bologna Underground Station
2005 - 2010

Detailed Design of the Underground Station - Reinforced Concrete and Steel structures.

Owner: ITALFERR
Client: STONE - ASTALDI
Tecon srl-NAQ PII Platform
2009 - 2010

Well Head Platform four legs in water depth of 28.5 m in Mediterranean Sea installed on a pre-existing submarine well template

Owner: ABU QIR PETROLEUM
Client: ROSETTI MARINO
Tecon srl-NAQ PII Platform
2009 - 2010

Well Head Platform four legs in water depth of 28.5 m in Mediterranean Sea installed on a pre-existing submarine well template

Owner: ABU QIR PETROLEUM
Client: ROSETTI MARINO
Tecon srl-Jamnagar Berth A1 Project
2009 - 2010

Indian Ocean Berth A1 four legged Platform with Steel/Concrete Deck made of concrete supported on Steel piles. Multidisciplinary Detailed Design

Owner: Reliance Port & Terminal LTD
Client: Reliance Port & Terminal LTD
Tecon srl-API Platform Revamping/Extension
2009 - 2010

Adriatic Sea Api “Isola” Landside Platform Revamping and Extension for new Risers with new Breasting and Mooring Dolphin system.

Owner: API REFINERY
Client: API REFINERY
Tecon srl-Milan Underground and Railway Lines Project
2001 - 2010

Milan Metro and Railway Undergroung Net Design of 20 Underground Stations and Deep Service Wells

Owner: Metropolitana Milanese
Client: Various Civil Contractors
Tecon srl-Milan Underground and Railway Lines Project
2001 - 2010

Milan Metro and Railway Undergroung Net Design of 20 Underground Stations and Deep Service Wells

Owner: Metropolitana Milanese
Client: Various Civil Contractors
Tecon srl-Libondo Platform
2008 - 2009

Offshore Congo Libondo 4 leg Platform to be installed in 113.6 m water depth. Detail design of Deck, Jacket and Foundations.

Owner: TOTAL
Client: ROSETTI MARINO
Tecon srl-Izabela Development Project
2008 - 2009

Adriatic Sea. Two Platforms and Interconnecting Sealines to be installed in 40 m water depth.

Owner: EDINA
Client: EDINA
Tecon srl-Congo M’Boundi Project
2008 - 2009

Offshore Congo Island Multidiscipline Feed Design a new LPG Terminal Island and W.I. Jetty.

Owner: ENI CONGO
Client: S.E.S. (Saipem Energy Services)
Tecon srl-Brescia - New Metro Line
2003 - 2009

Detailed and Construction Design of five deep Stations and two in-out Wells for TBM machine.

Owner: BRESCIA MUNICIPALITY
Client: METRO BRESCIA SCARL
Tecon srl-Saipem Scarabeo 8
2008 - 2009

Structural design of helideck for Sikorsky S-92 or S61N helicopters installed on Saipem Scarabeo 8 drilling rig.

Owner: FINCANTIERI
Client: BAYARDS
Tecon srl-Annamaria B Platform Topside
2007 - 2008

Adriatic Sea Annamaria B Platform Topside with Helideck Detailed Design

Owner: ENI
Client: SAIPEM ENERGY SERVICE
Tecon srl-Helideck Moswold
2007 - 2008

Steel Frame connected to the superstructure deck and supporting the Helideck Aluminium Structures

Owner: SAMSUNG
Client: BAYARDS
Tecon srl-Helideck Moswold
2007 - 2008

Steel Frame connected to the superstructure deck and supporting the Helideck Aluminium Structures

Owner: SAMSUNG
Client: BAYARDS
Tecon srl-JAMNAGAR Export Refinery Project (JERP)
2006 - 2008

Indian Ocean Gulf of Kutch Gujarat State Reliance Jamnagar Marine Terminal Increase Export Capacity Multidisciplinary Turn Key Project

Owner: Reliance Port & Terminal LTD
Client: BECHTEL FRANCE
Tecon srl-JAMNAGAR Export Refinery Project (JERP)
2006 - 2008

Indian Ocean Gulf of Kutch Gujarat State Reliance Jamnagar Marine Terminal Increase Export Capacity Multidisciplinary Turn Key Project

Owner: Reliance Port & Terminal LTD
Client: BECHTEL FRANCE
Tecon srl-KCOI LLP Yard Project
- 2008

Total length of “Temir At” yard sea front is 1000.0m with an operational quay front of 120.0m.

Owner: KCOI (Kazakhstan Caspian Offshore Industries LLP) - Rosetti
Client: ROSETTI MARINO
Tecon srl-Ikalou Development Project
2006 - 2007

Offshore Congo Two Drilling and Production Platforms installed in 80 m water depth.

Owner: ENI CONGO
Client: SAIPEM - ROSETTI MARINO
Tecon srl-Stena Drillmax and Stena Carron
2006 - 2007

Structural design of two helidecks for Sikorsky S61N and S92 helicopters installed on Stena Drillmax and Stena Carron drillships.

Owner: SAMSUNG
Client: BAYARDS
Tecon srl-Stena Drillmax and Stena Carron
2006 - 2007

Structural design of two helidecks for Sikorsky S61N and S92 helicopters installed on Stena Drillmax and Stena Carron drillships.

Owner: SAMSUNG
Client: BAYARDS
Tecon srl-Helideck Nexus
2006 - 2007

Structural Design of Helideck for EH101 or S61N Helicopters installed on Nexus FPSO (renamed Osx 1).

Owner: SAMSUNG
Client: BAYARDS
Tecon srl-Halfdan Project
2005 - 2007

Denmark North Sea Halfdan BC Accommodation Platform Topside installed in the Halfdan Field

Owner: MAERSK OLIE OG GAS AS
Client: ROSETTI MARINO
Tecon srl-Halfdan Project
2005 - 2007

Denmark North Sea Halfdan BC Accommodation Platform Topside installed in the Halfdan Field

Owner: MAERSK OLIE OG GAS AS
Client: ROSETTI MARINO
Tecon srl-Power generation Barge 8
2004 - 2006

Power generation Barge 8 of the Kashagan Field with two main stick-built modules, each housing two 30 MW gas turbine generators.

Owner: AGIP KASHAGAN
Client: ABB - ROLLS ROYCE JV
Tecon srl-Ersai quay Project
- 2005

Fabrication yard located in the gulf of Kuryk, south of Aktau in the east coast of Caspian Sea. The main quay is designed for Load-out of a 80000 kN jacket.

Owner: ERSAI YARD
Client: SAIPEM
Tecon srl-South Pars Project
2004 - 2005

Feed Project of a LNG export Marine Facility with two Berths for gas carriers up to 250.000 m3

Owner: TECHNIP/JGC
Client: SOGREAH
Tecon srl-SAKHALIN II Phase 2
2004 - 2005

Transportation and Installation of LUN-A & PA-B topsides by the Float-over Mating system with the NBB barge

Owner: Sakhalin Energy Investment Company Ltd
Client: SAMSUNG SAIPEM
Tecon srl-Sabratha Living Quarter
2003 - 2004

Detailed Design of the Living Quarter for 120 people installed on Sabratha Platform

Owner: AGIP GAS BV Libyan
Client: ROSETTI MARINO FRANZ ISELLA
Tecon srl-Ivana A and Ivana K Platforms
1996 - 2002

N°2 Drilling/Production/Compression Platforms in 43m water depth Jackets Topsides and Connecting Bridge

Owner: INAGIP
Client: ROSETTI MARINO
Tecon srl-Okono/Okpoho Development Field
2000 - 2001

Offshore Nigeria. Basic and Detail Design of the Okpoho Wellhead Platform: 4 legs in 100 m water depth.

Owner: NPDC - AGIP NIGERIA
Client: SEI - SAIPEM ENERGY INTERNATIONAL
Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.