Shell Clipper PH Platform

05/08/2014

The jacket, piles, living quarter deck and bridge linking the new Clipper PH accommodation platform to the old PT platform in the Clipper field seen during topsides load-out, prior to departure from the Rosetti Piomboni yard, transit though the Ravenna port channel and after installation at site (first on the right).

The structural design of all components including fabrication activity follow-up was developed by Tecon.

The structures were delivered on schedule from the fabrication yard 20 months after Contract award. 

Offshore Platforms

  • 05/08/2014

    Shell Clipper PH Platform

    Tecon srl-news_tecon_JAMNAGAR_1

    Shell CLIPPER PH accommodation platform successfully installed in the North Sea

    Read more
Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.