The Base Load Power Hub is an innovative offshore platform at the Hollandse Kust Noord wind farm (18.5km offshore Netherlands) that integrates multiple energy storage technologies: battery systems, hydrogen production via electrolysis, and fuel cell conversion. This unmanned testbed ensures continuous 1MW baseload power supply, balancing renewable energy intermittency through floating solar PV, short-duration BESS, and long-term hydrogen storage.

Project Scope


TECON provided complete structural engineering for the BLPH platform: topside structure (40m × 16m, two deck levels), transition piece, and caisson systems. The scope included in-service design, pre-service analyses (loadout, sea transportation, offshore lifting), and installation engineering.

Topside & Transition Piece

  • Two-deck system (El. +23.310m and +30.310m ToS) with hydrogen vessel support structure
  • Four-arm TP connecting topside to monopile via bolted flange (El. +17.050m)
  • Access systems: CTV ladder and W2W platforms for personnel transfer
  • Secondary steel: walkways, stairs, equipment supports

Caissons & Appurtenances

  • Three caissons (2 seawater lift + 1 brine disposal) on dedicated frame
  • Multi-level supports at El. +14.500m, +7.000m, and 0.000m LAT
  • Floating solar cable hang-off system within monopile

Engineering Approach


Design per ISO 19900/19901/19902 and DNV-ST-0145 standards using LRFD methodology. SACS software for global analysis, ANSYS for critical joint validation. Load cases include in-service (operating + 100-year extreme), pre-service (loadout, 30-day sea transport, lifting), and accidental scenarios (ship impact, dropped objects, blast).

Key Design Parameters: 100-year wind 40.1 m/s, extreme waves Hs=7.6m, 150mm marine growth, ice accretion. Max operating weight 2,400 tonnes, CoG within 1.5m radius of monopile centerline. Materials: S235-S460 grades with Z-properties for critical connections. Transport fatigue analysis across 7 navigation zones from Ravenna to North Sea.

Project Data

DESIGN LIFE
25.5 years

MAX WEIGHT
2,400 t

DECK SIZE
40m × 16m

WATER DEPTH
~21 m

DISTANCE OFFSHORE
18.5 km

H₂ STORAGE
360 m³

find out more projects

FILANOVSKY Topsides

NAQ PII PLATFORM

Contact Our Engineers FOR a Professional Consultation

Tecon is an engineering consulting company with over 40 years of experience in offshore, marine and civil structural design.
P.IVA 06503230150
CONTACT US
TECON srl
Strada 1, snc
Palazzo Congressi
20057 Assago (MI), Italy
View on maps Phone:  +39 02 92882150 Fax:  +39 02 92882180
MORE ABOUT US
©2026 Tecon srl. All Rights Reserved.
CREDITS
Privacy Policy
Cookie Policy