FAUZIA & ELETTRA Decks

Adriatic Sea Gas Field Development | Italy

TECON provided comprehensive detailed structural design services for the FAUZIA and ELETTRA offshore platform decks, commissioned by ENI S.p.A. and executed through client ROSETTI MARINO. These unmanned production platforms were specifically engineered to exploit the homonymous gas fields in the Adriatic Sea.

The project presented unique challenges in designing compact, efficient production facilities capable of operating in the demanding offshore environment of the Adriatic Sea. Both platforms required sophisticated engineering solutions to integrate processing equipment, well completion systems, and export infrastructure within limited deck space while maintaining structural integrity throughout all operational phases.

Project Scope

The FAUZIA and ELETTRA platforms represent state-of-the-art unmanned gas production facilities, each featuring a three-level deck configuration optimized for efficient gas processing and export operations. The platforms are designed for minimal manning with access provided through dual boat landing systems positioned on the south and east sides of each structure.

FAUZIA Platform Configuration

  • Main Deck: 19.4m × 18.5m at elevation +21.3m LAT, housing primary production equipment and control systems
  • Cellar Deck: 19.4m × 18.5m at elevation +16.1m LAT, containing wellhead equipment and separation systems
  • Lower Deck: 18.0m × 17.0m at elevation +12.0m LAT, supporting utilities and auxiliary systems
  • Well Configuration: Two 30-inch double completion wells plus one conductor spare for future development
  • Export System: 12-inch export riser connecting to the existing Barbara B platform infrastructure
  • Total Structure Weight: 675 metric tonnes including all equipment and structural steel

ELETTRA Platform Configuration

  • Main Deck: 19.4m × 18.5m at elevation +22.9m LAT, featuring integrated process equipment layout
  • Cellar Deck: 19.4m × 18.5m at elevation +17.4m LAT, incorporating gas/water separation technology
  • Lower Deck: 18.0m × 17.0m at elevation +12.4m LAT, housing support systems and utilities
  • Well Configuration: One 30-inch double completion well with dedicated gas/water separators per string
  • Export System: 8-inch sea-line connection to existing Bonaccia platform for gas transmission
  • Total Structure Weight: 565 metric tonnes optimized for efficient offshore installation

Pre-Production Innovation: To facilitate accelerated production schedules, well drilling operations were executed using modular Well Head Modules (6.0m × 6.0m) prior to final deck installation on the respective jacket structures. This phased approach minimized offshore construction time and reduced weather-related delays.

Platform Infrastructure & Equipment

  • Davit-type crane systems for equipment handling and maintenance operations
  • Vertical cold vent mast for controlled gas venting during maintenance
  • Integrated purge-burner system for safety and operational flexibility
  • Dual boat landing facilities ensuring safe personnel access in varying sea conditions
  • Advanced gas/water separation systems on ELETTRA for optimized production efficiency

Engineering Approach

TECON’s engineering methodology encompassed comprehensive structural analysis across all operational phases, ensuring platform integrity from fabrication through installation and into long-term service life. The detailed design process incorporated advanced finite element analysis, fatigue assessments, and environmental load evaluations specific to Adriatic Sea conditions.

Technical Services Delivered

  • Structural Design Excellence: Complete detailed structural engineering for in-service operations, construction sequences, and offshore installation procedures, ensuring compliance with international offshore standards
  • Material Specifications: Development of comprehensive material selection criteria and specifications optimized for marine environment corrosion resistance and long-term durability
  • Construction Documentation: Detailed construction specifications, fabrication drawings, and quality control procedures to support yard fabrication and installation activities
  • Load Analysis: Comprehensive evaluation of operational loads, environmental forces, and installation dynamics using advanced computational modeling techniques
  • Integration Engineering: Coordination with process, mechanical, and electrical disciplines to ensure seamless integration of all platform systems

The successful completion of the FAUZIA and ELETTRA platforms demonstrates TECON’s capabilities in delivering complex offshore structures that meet stringent safety, operational, and environmental requirements while optimizing construction efficiency and long-term reliability.

Project Data

OWNER
ENI S.p.A. Division E&P
CLIENT
ROSETTI MARINO
LOCATION
Adriatic Sea, Italy
PROJECT PERIOD
2013 – 2014
FAUZIA WEIGHT
675 tonnes
ELETTRA WEIGHT
565 tonnes
PLATFORM LEVELS
3 Decks Each
TOTAL WELLS
3 Production + 2 Spare
DECK AREA
~350 m² per level

find out more projects

Tyra Redevelopment Project

Costa Concordia Wreck Removal

Contact Our Engineers FOR a Professional Consultation

Tecon is an engineering consulting company with over 40 years of experience in offshore, marine and civil structural design.
P.IVA 06503230150
CONTACT US
TECON srl
Strada 1, snc
Palazzo Congressi
20057 Assago (MI), Italy
View on maps Phone:  +39 02 92882150 Fax:  +39 02 92882180
MORE ABOUT US
©2026 Tecon srl. All Rights Reserved.
CREDITS
Privacy Policy
Cookie Policy