SAKHALIN II Phase 2

  • Owner: Sakhalin Energy Investment Company Ltd
  • Client: SAMSUNG SAIPEM
  • Country: Russia
  • Period: 2004- 2005
  • TECON SOW: Transportation and Installation of LUN-A & PA-B topsides by the Float-over Mating system

Work description

Transportation and Installation of LUNSKOYE (LUN-A) & PILTUN-ASTOKHSKOYE (PA-B) topsides using purpose built T-shaped cargo barges having a maximum displacement over 50.000,00 t.

Tecon services

Project Categories

Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.