SPD13A WHP JACKET

  • Owner: N.I.O.C. Pars Oil & Gas Company
  • Client: ROSETTI MARINO
  • Country: Iran
  • Period: 2016- 2017
  • TECON SOW: Detailed Design of Jacket and Wellhead structures

Work description

On March 2015 M/V Alpine Eternity caused large damages to the Jacket SPD 13A. Therefore Company decided to remove the damaged jacket and to design, fabricate and install a new jacket. The existing jacket will be removed leaving in place the bottom fame, including the mudmats. The legs will be cut at an elevation from sea bed such that the cut legs can be used as docking bumpers for positioning the jacket and as temporary supports for the jacket during piling.

The platform, in approximately 57.20 m water depth, is composed by:

Tecon services

• Detail design of the Jacket and Wellhead structures for the in‐place and temporary phases. 

Download

SPD13A WHP JACKET (507.74 kB)

Project Categories

Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.